July 2020 Top Offer: 2x 125 MW GE Frame 9E gas units for dismantling from spring 2021 onwards, 50 Hz, 15 years old

July 2020 Top Offer: 2x 125 MW GE Frame 9E gas units for dismantling from spring 2021 onwards, 50 Hz, 15 years old

[July 2020] Located in Western Europe, these two power generation units for sale consist of 2 General Electric gas turbine generator sets, built in 2005, each with an electrical output of approx. 125 MWe. For both sets, the operating times so far have been approx. 105,000 hours and 1,200 starts.

These two General Electric gas turbine sets are part of a CCGT power plant and are expected to be dismantled and replaced by new plant components from May 2021 onwards as part of an extensive modernisation, which also includes generators, transformers and auxiliary systems.

Until then, these GE Frame 9E heavy-duty gas turbines (of type GT PG9171 E) can be tested by interested buyers, ideally between November 2020 and March 2021. The two GT gensets are offered as a package deal, however, the owner is prepared to sell selected equipment separately, too. An inspection of the plant site in Western Europe is already possible any time.

If you would like to learn more about this staggering offer, please contact our troveo team.

And did you know? At troveo, posting anonymised purchase requests for second-hand power plants and equipment is always free of charge! Even sale offer ads are free of charge within the scope of an initial, non-binding market test. We would be pleased to support you in your searches or sales.